Industrial automation systems - Manufacturing Message Specification - Part 3: Companion standard for robotics (Amendment)
30.99 CD approved for registration as DIS
Robotics for electricity generation, transmission, and distribution systems: Part 1-1: Terminology for electric power robots
50.60 Close of voting. Proof returned by secretariat
Robotics - Safety requirements - Part 1: Industrial robots (ISO/FDIS 10218-1:2024)
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Robotics - Safety requirements - Part 2: Industrial robot applications and robot cells (ISO/FDIS 10218-2:2024)
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Robotics for electricity generation, transmission, and distribution systems: Part 1-1: Terminology for electric power robots
50.60 Close of voting. Proof returned by secretariat
Robotics for electricity generation, transmission and distribution systems - Part 2-1: General Technical Requirements for UAS for Overhead Power Lines Inspection
30.60 Close of voting/ comment period
Robotics — Performance criteria and related test methods for service robots — Part 8: Electric vehicle charging robots
20.00 New project registered in TC/SC work programme
Robotics — Modularity for service robots — Part 203: Information Model for Hardware
20.00 New project registered in TC/SC work programme
Robotics — Safety design for industrial robot systems — Part 3: Guidance for the use of ISO 10218-2 (ed 2)
20.00 New project registered in TC/SC work programme
Robotics — Performance criteria and related test methods for service robots — Part 5: Locomotion for legged robots
30.60 Close of voting/ comment period
Robotics — Performance criteria and related test methods for service robots — Part 6: Lower-limb wearable robots
30.20 CD study/ballot initiated
Robotics — Autonomous mobile robots for industrial environments — Communications and interoperability
30.60 Close of voting/ comment period
Robotics — Safety requirements — Part 1: Industrial robots
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Robotics — Safety requirements — Part 2: Industrial robot applications and robot cells
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Robotics — Modularity for service robots — Part 202: Information model for software modules
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Robotics — Performance criteria and related test methods for service robots — Part 7: Travelling around humans
10.20 New project ballot initiated
Robotics — Modularity for service robots — Part 402: Modules for exoskeleton robots
00.60 Close of review
Robotics — Test methods for measuring the energy consumption of robots — 6-Axis articulated industrial robots
20.20 Working draft (WD) study initiated
Robotics for electricity generation, transmission and distribution systems - Part 2-1: General technical requirements for uas for overhead power lines inspection
10.99 New project approved
Robotics - Safety requirements for service robots (ISO/DIS 13482:2024)
40.60 Close of voting