Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC - Equipment for testing, measuring or monitoring of protective measures - Part 10: Combined measuring equipment for testing, measuring and monitoring of protective measures
60.55 Ratification completed (DOR)
Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC - Equipment for testing, measuring or monitoring of protective measures - Part 1: General requirements
40.60 Close of voting
Switchgear and controlgear and their assemblies for low voltage - Integration of radiocommunication device above 380 MHz into an equipment
60.55 Ratification completed (DOR)
Signalling on low voltage electrical installations in the frequency range 3 kHz to 148,5 kHz Part 4-2: Low voltage decoupling filters - Safety requirements
45.99 Dispatch of FV draft to CCMC
Signalling on low-voltage electrical installations in the frequency range 3 kHz to 148,5 kHz Part 4-7: Portable low voltage decoupling filters - Safety requirements
45.99 Dispatch of FV draft to CCMC
Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC - Equipment for testing, measuring or monitoring of protective measures - Part 13: Hand-held and hand-manipulated current clamps and sensors for measurement of leakage currents in electrical distribution systems
60.55 Ratification completed (DOR)
Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC - Equipment for testing, measuring or monitoring of protective measures - Part 14: Equipment for testing the safety of electrical equipment of machinery
60.55 Ratification completed (DOR)
Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC - Equipment for testing, measuring or monitoring of protective measures - Part 16: Equipment for testing the effectiveness of the protective measures of electrical equipment and/or medical electrical equipment
60.55 Ratification completed (DOR)
Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC - Equipment for testing, measuring or monitoring of protective measures - Part 9: Equipment for insulation fault location in IT systems
50.60 Close of voting. Proof returned by secretariat
Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC - Equipment for testing, measuring or monitoring of protective measures - Part 9: Equipment for insulation fault location in IT systems
10.99 New project approved
Electrical installations in ships - Part 302-2: Low voltage switchgear and controlgear assemblies - Marine power
40.20 DIS ballot initiated: 12 weeks
Low voltage electrical installations - Part 6: Verification
30.20 CD study/ballot initiated
Low voltage electrical installations - Part 7-712: Requirements for special installations or locations - Solar photovoltaic (PV) power supply systems
50.00 Final text received or FDIS registered for formal approval
<p>Low-voltage electrical installations - Part 7-751: Requirements for special installations or locations - Low voltage generating sets</p>
30.99 CD approved for registration as DIS
Fire hazard testing - Part 1-14: Guidance on the different levels of power and energy related to the probability of ignition and fire in low voltage electrotechnical products
20.99 WD approved for registration as CD
Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC – equipment for testing, measuring or monitoring of protective measures – part 18: DC EV supply equipment monitoring device
30.99 CD approved for registration as DIS
Electrical safety in low voltage distribution systems up to 1.000 V AC and 1.500 V DC - Equipment for testing, monitoring or measuring the protective measures in energy distribution system - part 19: Monitoring device for earthing impedance in IT-systems
20.99 WD approved for registration as CD
Low voltage surge protective devices - Part 21: Surge protective devices connected to telecommunications and signalling networks - Requirements and testing methods
40.60 Close of voting
IEC 61869-201: Instrument transformers - Part 201: General requirements for Instrument Transformers for low voltage applications (≤1000 V AC and 1500 V DC)
20.99 WD approved for registration as CD
Switchgear and controlgear and their assemblies for low voltage - Environmental aspects
30.60 Close of voting/ comment period
Switchgear and controlgear and their assemblies for low voltage - Security aspects
40.20 DIS ballot initiated: 12 weeks
Utility connections in port - Part 3: Low Voltage Shore Connection (LVSC) Systems - General requirements
40.99 Full report circulated: DIS approved for registration as FDIS
Utility connections in port — Part 3: Low Voltage Shore Connection (LVSC) Systems — General requirements
40.60 Close of voting
Corrigendum 1 - Maintenance of low voltage switchgear and controlgear and their assemblies
60.00 Standard under publication
Transformer bushings dimensional standardization - Part 1: Medium voltage and low voltage bushings
20.99 WD approved for registration as CD
Small craft — Alternating and direct current installations of electrical systems — Part 2: Low voltage DC
10.60 Close of voting
Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC – Equipment for testing, measuring or monitoring of protective measures – Part 12-2: Functional test procedure for PMD and EPMF
10.60 Close of voting
Leisure accommodation vehicles - 12 V direct current extra low voltage electrical installations - Part 1: Caravans
00.60 Close of review
Leisure accommodation vehicles - 12 V direct current extra low voltage electrical installations - Part 2: Motor caravans
00.60 Close of review
Test requirements for low voltage aerial bundled cable accessories - Part 1: Generalities
40.20 DIS ballot initiated: 12 weeks
Test requirements for low voltage aerial bundled cable accessories - Part 2: Tension and suspension clamps, fittings and brackets for self supporting system
40.20 DIS ballot initiated: 12 weeks
Test requirements for low voltage aerial bundled cable accessories - Part 3: Tension and suspension clamps for neutral messenger system
40.20 DIS ballot initiated: 12 weeks
Test requirements for low voltage aerial bundled cable accessories - Part 4: Connectors
40.20 DIS ballot initiated: 12 weeks
Test requirements for low voltage aerial bundled cable accessories - Part 5: Electrical ageing test
40.20 DIS ballot initiated: 12 weeks
Test requirements for low voltage aerial bundled cable accessories - Part 6: Environmental testing
40.20 DIS ballot initiated: 12 weeks
Powerline communication apparatus used in low voltage installations - Radio disturbance characteristics - Limits and methods of measurement - Part 1: Apparatus for in-home use
40.60 Close of voting
Powerline communication apparatus used in low voltage installations - Radio disturbance characteristics - Limits and methods of measurement – Part 3: Apparatus operating above 30 MHz
40.60 Close of voting
Powerline communication apparatus used in low voltage installations - Radio disturbance characteristics - Limits and methods of measurement - Part 4: Apparatus including MIMO capability
10.99 New project approved
Fire hazard testing - Part 1-14: Guidance on the different levels of power and energy related to the probability of ignition and fire in low voltage electrotechnical products
10.99 New project approved
Electrical safety in low voltage distribution systems up to 1 000 v AC and 1 500 v DC - Equipment for testing, measuring or monitoring of protective measures - Part 18: DC EV supply equipment monitoring device
10.99 New project approved
Electrical safety in low voltage distribution systems up to 1.000 v AC and 1.500 v DC - Equipment for testing, monitoring or measuring the protective measures in energy distribution system - Part 19: Monitoring device for earthing impedance in IT-systems
10.99 New project approved
Low voltage surge protective devices - Part 21: Surge protective devices connected to telecommunications and signalling networks - Requirements and testing methods
40.60 Close of voting
Instrument transformers - Part 201: General requirements for Instrument Transformers for low voltage applications
10.99 New project approved
IEC 61869-201: Instrument transformers - Part 201: General requirements for instrument transformers for low voltage applications (≤1000 V AC and 1500 V DC)
10.99 New project approved
Instrument transformers - Part 202: Additional requirements for Current Transformers for Low Voltage applications
10.99 New project approved
Instrument transformers - Part 210: Additional requirements for low power current transformers and current sensors for low voltage applications
10.99 New project approved
Instrument transformers - Part 220: Safety requirements for Instrument Transformers for low voltage applications
10.99 New project approved
Switchgear and controlgear and their assemblies for low voltage - Environmental aspects
10.99 New project approved
Switchgear and controlgear and their assemblies for low voltage - Security aspects
40.20 DIS ballot initiated: 12 weeks
Small craft — Alternating and direct current installations of electrical systems — Part 1: Low voltage
10.99 New project approved
Integrated Circuits – Electronic fuses for low voltage automotive power distribution networks
00.99 Approval to ballot proposal for new project
Low voltage electrical installations - Part 7-712: Requirements for special installations or locations - Solar photovoltaic (PV) power supply systems
40.60 Close of voting
Low-voltage electrical installations - Part 7-751: Requirements for special installations or locations - Low voltage generating sets
10.99 New project approved