Use the form below to find particular standards or projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”. You can also search using the Advance Search facility.
Alarm systems - Part 4: Electromagnetic compatibility - Product family standard: Immunity requirements for components of fire, intruder, hold up, CCTV, access control and social alarm systems
20.60 Close of comment period
Powerline communication apparatus used in low voltage installations - Radio disturbance characteristics - Limits and methods of measurement - Part 1: Apparatus for in-home use
40.60 Close of voting
Powerline communication apparatus used in low voltage installations - Radio disturbance characteristics - Limits and methods of measurement – Part 3: Apparatus operating above 30 MHz
40.60 Close of voting
Powerline communication apparatus used in low voltage installations - Radio disturbance characteristics - Limits and methods of measurement - Part 4: Apparatus including MIMO capability
10.99 New project approved
Radio disturbance characteristics - Limits and methods of measurement Part 5: PLC in outdoor Photovoltaic (PV) sites (EN 50561)
10.99 New project approved
Electromagnetic compatibility of multimedia equipment - Immunity requirements
40.60 Close of voting
Radio-frequency disturbance characteristics - Limits and methods of measurement (Requirements for air-gap wireless power transfer (WPT) for electric vehicle (EV))
10.99 New project approved
Vehicles, boats and internal combustion engines - Radio disturbance characteristics - Limits and methods of measurement for the protection of off-board receivers
40.20 DIS ballot initiated: 12 weeks
Specification for radio disturbance and immunity measuring apparatus and methods - Part 1-4: Radio disturbance and immunity measuring apparatus - Antennas and test sites for radiated disturbance measurements
40.60 Close of voting
Electromagnetic compatibility of multimedia equipment - Emission requirements
10.99 New project approved
Rotating electrical machines - Part 1: Rating and performance
10.99 New project approved
Automatic electrical controls - Part 2-14: Particular requirements for electric actuators
40.20 DIS ballot initiated: 12 weeks
Automatic electrical controls - Part 2-23: Particular requirements for electrical sensors and sensing elements
10.99 New project approved
Automatic electrical controls-Part 2-24: Particular requirements for displacement sensing controls
10.99 New project approved
Automatic electrical controls - Part 2-25: Particular requirements for current sensing controls
10.99 New project approved
Automatic electrical controls - Part 2-6: Particular requirements for automatic electrical pressure sensing controls including mechanical requirements
40.20 DIS ballot initiated: 12 weeks
Automatic electrical controls - Part 2-8: Particular requirements for electrically operated water valves, including mechanical requirements
40.20 DIS ballot initiated: 12 weeks
Shunt power capacitors of the non-self-healing type for a.c. systems having a rated voltage up to and including 1000 v - Part 1: General
10.99 New project approved