Use the form below to find particular standards or projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”. You can also search using the Advance Search facility.
Road and airfield surface characteristics - Test methods - Part 4: Method for measurement of slip/skid resistance of a surface: The pendulum test
40.60 Close of voting
Soil improvers and growing media - Determination of pH
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Soil improvers and growing media - Determination of electrical conductivity
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Soil improvers and growing media - Determination of organic matter content and ash
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Soil improvers and growing media - Sample preparation - Part 1: Sample preparation for chemical and physical tests, determination of dry matter content, moisture content and laboratory bulk density
50.60 Close of voting. Proof returned by secretariat
Soil improvers and growing media - Sample preparation - Part 2: Sample preparation for microbiological examination
50.60 Close of voting. Proof returned by secretariat
Soil improvers and growing media - Determination of physical properties - Dry bulk density, air volume, water volume, shrinkage value and total pore space
40.10 harmonizedStageCodeLabel.40.10
Machines and plants for the manufacture, treatment and processing of hollow glass - Safety requirements - Part 3: IS machines
45.99 Dispatch of FV draft to CCMC
Machines and plants for the manufacture, treatment and processing of hollow glass - Safety requirements - Part 6: Multi-station multi-inspection machines
40.60 Close of voting
Machines and plants for the manufacture, treatment and processing of hollow glass - Safety requirements - Part 7: Travelling head inspection machines
40.60 Close of voting
Machines and plants for the manufacture, treatment and processing of hollow glass - Safety requirements - Part 8: Fixed head inspection machines
40.60 Close of voting
Machines and plants for the manufacture, treatment and processing of hollow glass - Safety requirements - Part 9: Impact testing machines
40.60 Close of voting
Devices to prevent pollution by backflow of potable water - Unrestricted air gap-Family A - Type A
45.99 Dispatch of FV draft to CCMC
Round and sawn timber - Method of measurement of dimensions - Part 2: Round timber
40.60 Close of voting
Railway applications - Wheelsets and bogies - Part 2: Design method for axles with internal journals
30.99 CD approved for registration as DIS