Energy management system

Related standards or drafts

Systems interface between customer energy management system and the power management system - Part 4: Demand Side Resource Interface

50.60 Close of voting. Proof returned by secretariat

CLC/TC 57

Systems interface between customer energy management system and the power management system - Part 4: Demand Side Resource Interface

50.60 Close of voting. Proof returned by secretariat

TC 57

<p>Standard Interface for Connecting Charging Stations to Local Energy Management Systems - Part -1 General Requirements, Use Cases and abstract Messages</p>

50.00 Final text received or FDIS registered for formal approval

TC 69

<p>Standard Interface for Connecting Charging Stations to Local Energy Management Systems - Part 2 Specific Data Model Mapping</p>

40.60 Close of voting

TC 69

<p>Standard Interface for Connecting Charging stations to Local Energy Management Systems - Part 3 Communication Protocol and Cybersecurity Specific Aspects</p>

40.60 Close of voting

TC 69

<p>Standard Interface for Connecting Charging stations to Local Energy Management Systems - Part-4 Test Specifications</p>

20.99 WD approved for registration as CD

TC 69

Energy Efficiency Systems - Smart Grid - Customer Energy Management Systems - Interface between the Energy Management Gateway and BEM / CEM - Data model and messaging

20.99 WD approved for registration as CD

TC 23/SC 23K

Energy efficiency systems - Smart grid - Customer energy management systems - Interface between the home/building CEM and resource manager(s) - Data model and messaging

30.99 CD approved for registration as DIS

TC 23/SC 23K

Systems interface between customer energy management system and the power management system - Part 10-1: Open Automated Demand Response (OpenADR 2.0b Profile Specification)

60.00 Standard under publication

PC 118

Systems interface between customer energy management system and the power management system - Part 2: Use cases and requirements

40.99 Full report circulated: DIS approved for registration as FDIS

TC 57

Microgrids - Technical requirements - Testing for Microgrid Monitoring, Control, and Energy Management Systems

20.99 WD approved for registration as CD

TC 8/SC 8B

Energy management systems — Energy data collection plan

30.20 CD study/ballot initiated

ISO/TC 301

Energy management systems and energy savings --Decarbonization — Requirements with guidance for use

30.20 CD study/ballot initiated

ISO/TC 301

Energy Management System Application Program Interface (EMS-API) - Part 303: Common information model (CIM), Network Model Management

10.99 New project approved

CLC/TC 57

Energy Management System Application Program Interface (EMS-API) - Part 459: Framework for managing shared network model information

10.99 New project approved

CLC/TC 57

Energy management system application program interface (EMS-API) - Part 501: Common Information Model Resource Description Framework (CIM RDF) schema

10.99 New project approved

CLC/TC 57

Standard interface for connecting charging points/charging stations to local energy management systems - Part -1 general requirements, use cases and abstract messages

40.60 Close of voting

CLC/TC 69X

Local charging station management systems and local energy management systems network connectivity and information exchange - Part 2: Specific data model mapping

40.60 Close of voting

CLC/TC 69X

Local charging station management systems and local energy management systems network connectivity and information exchange - Part 3: Communication protocol and cybersecurity specific aspects

40.60 Close of voting

CLC/TC 69X

Local charging station management systems and local energy management systems network connectivity and information exchange - Part-4 test specifications

10.99 New project approved

CLC/TC 69X

Energy efficiency systems - Smart grid - Customer energy management systems - Interface between the home/building CEM and resource manager(s) - Data model and messaging

10.99 New project approved

CLC/TC 205