50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks Nov 28, 2024
CEN
CEN/TC 147 Cranes - Safety
European Norm
47.020.40 Lifting and cargo handling equipment | 53.020.20 Cranes
This document applies to general purpose offshore cranes including their supporting pedestals and structures.
This document is applicable to general purpose offshore cranes, whose structures are made of steel.
This document provides requirements for all significant hazards, hazardous situations and events relevant to general purpose offshore cranes, for lifting of goods and lifting of persons, when used as intended and under the conditions foreseen by the risk assessment (see Clause 4).
This document is applicable to general purpose offshore cranes, which are manufactured after the date of approval by CEN of this document.
This document is not applicable for:
a) transportation, assembly, disabling, scrapping, installation or erecting of the crane;
b) any item attached to the hook, such as loads, non-fixed load lifting attachments, lifting accessories, baskets, carriers and containers;
c) lifting operations in ambient temperatures below - 20 °C;
d) lifting operations in ambient temperatures above 45 °C;
e) accidental loads as result of collisions, earthquakes, explosions, etc., which are not covered by exceptional loads defined in Table B.7 ;
f) floating cranes (covered by EN13852-2), light offshore cranes (covered by FprEN13852-3) and 2D/3D motion compensated cranes;
g) subsea lifting operations;
h) lifting operations involving more than one crane;
i) emergency rescue operations (except training).
Legislation related to this standard
Directive 2006/42/EC of the European Parliament and of the Council of 17 May 2006 on machinery, and amending Directive 95/16/EC (recast)
Directive 2014/34/EU Of The European Parliament And Of The Council of 26 February 2014 on the harmonisation of the laws of the Member States relating to equipment and protective systems intended for use in potentially explosive atmospheres (recast)
PUBLISHED
EN 13852-1:2013
IN_DEVELOPMENT
FprEN 13852-1
50.20
Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Nov 28, 2024