Electrical and instrumentation loop check

Publication date:   Nov 30, 2007

General information

99.60   Withdrawal effective   Dec 13, 2015

CENELEC

CLC/TC 65X Industrial-process measurement, control and automation

European Norm

25.040.01   Industrial automation systems in general

Buying

  Withdrawn

PDF - €36.35

  English  



Buy

Scope

describes the steps recommended to complete a loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. Is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). It does not include a detailed checkout of power distribution systems, except as they relate to the loops being checked (i.e. a motor starter or a power supply to a four-wire transmitter).

Life cycle

NOW

WITHDRAWN
EN 62382:2007
99.60 Withdrawal effective
Dec 13, 2015

REVISED BY

PUBLISHED
EN 62382:2013