EN 62382:2013

Control systems in the process industry - Electrical and instrumentation loop check EN 62382:2013

Publication date:   Apr 17, 2013

General information

60.60   Standard published   Mar 1, 2013

CENELEC

CLC/TC 65X Industrial-process measurement, control and automation

European Norm

25.040.40   Industrial process measurement and control

Buying

Published

Language in which you want to receive the document.

Scope

IEC 62382:2012 describes the steps recommended to complete a loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. This standard is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). This second edition cancels and replaces the first edition published in 2006 and constitutes a technical revision. The main changes with respect to the previous edition are: The definition of the documents mentioned in the standards is in accordance with IEC 62708: Documents for Electrical and Instrumentation Projects in the Process Industry. Subclause 6.3 has been revised.

Life cycle

PREVIOUSLY

WITHDRAWN
EN 62382:2007

NOW

PUBLISHED
EN 62382:2013
60.60 Standard published
Mar 1, 2013

REVISED BY

PUBLISHED
EN IEC 62382:2024




Access Genorma App Everywhere

Get fast and easy access to top European and International standards (EN, ISO, IEC) via your mobile phone, tablet or the web.