99.60 Withdrawal effective Dec 13, 2015
CENELEC
CLC/TC 65X Industrial-process measurement, control and automation
European Norm
25.040.01 Industrial automation systems in general
Withdrawn
describes the steps recommended to complete a loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. Is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). It does not include a detailed checkout of power distribution systems, except as they relate to the loops being checked (i.e. a motor starter or a power supply to a four-wire transmitter).
WITHDRAWN
EN 62382:2007
99.60
Withdrawal effective
Dec 13, 2015
PUBLISHED
EN 62382:2013