Unfired pressure vessels — Part 15: Specific requirements for hydrogen applications
00.60 Close of review
Unfired pressure vessels - New approaches to determine negligible creep of steels for EN 13445
10.99 New project approved
LPG equipment and accessories - Welded steel pressure vessels for LPG road tankers - Design and manufacture
50.60 Close of voting. Proof returned by secretariat
LPG equipment and accessories - Welded steel pressure vessels for LPG road tankers - Design and manufacture
50.60 Close of voting. Proof returned by secretariat
Unfired pressure vessels - Part 4: Fabrication
10.99 New project approved
Unfired pressure vessels - Part 5: Inspection and testing
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Unfired pressure vessels - Part 8: Additional requirements for pressure vessels of aluminium and aluminium alloys
40.60 Close of voting
LPG equipment and accessories - Pressure relief valves for LPG pressure vessels - Ancillary equipment
50.60 Close of voting. Proof returned by secretariat
Unfired pressure vessels - Requirements for the design and fabrication of pressure vessels and pressure parts constructed from cast iron with an elongation after fracture equal or less than 15 %
50.60 Close of voting. Proof returned by secretariat
Unfired pressure vessels - Part 11: Additional requirements for pressure vessels of titanium and titanium alloys
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
LPG equipment and accessories - Pressure relief valves for LPG pressure vessels - Ancillary equipment
45.99 Dispatch of FV draft to CCMC
LPG Equipment and accessories - Pressure relief valves for LPG pressure vessels
45.99 Dispatch of FV draft to CCMC
LPG equipment and accessories - Pressure relief valves for LPG pressure vessels - Reconditioning requirements
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Simple unfired pressure vessels designed to contain air or nitrogen - Part 1: Pressure vessels for general purposes
60.55 Ratification completed (DOR)
Simple unfired pressure vessels designed to contain air or nitrogen - Part 2: Pressure vessels for air braking and auxiliary systems for motor vehicles and their trailers
60.55 Ratification completed (DOR)
Simple unfired pressure vessels designed to contain air or nitrogen - Part 3: Steel pressure vessels designed for air braking equipment and auxiliary pneumatic equipment for railway rolling stock
60.55 Ratification completed (DOR)
Simple unfired pressure vessels designed to contain air or nitrogen - Part 4: Aluminium alloy pressure vessels designed for air braking equipment and auxiliary pneumatic equipment for railway rolling stock
60.55 Ratification completed (DOR)
Gaseous Hydrogen - Pressure vessels for stationary storage — Part 1: Part 1: general requirements
20.00 New project registered in TC/SC work programme
Gaseous Hydrogen - Pressure vessels for stationary storage — Part 2: Material test data of class A materials (steels and aluminum alloys) compatible to hydrogen service
20.00 New project registered in TC/SC work programme
Gaseous Hydrogen - Pressure vessels for stationary storage — Part 3: Pressure cycle test data to demonstrate shallow pressure cycle estimation methods
20.00 New project registered in TC/SC work programme
Stainless steels - Technical delivery conditions for sheet/plate and strip for boilers and pressure vessels
20.60 Close of comment period
Unfired pressure vessels - Part 12: Additional requirements for pressure vessels of copper and copper alloys
40.60 Close of voting
Unfired pressure vessels - Part 14: Additional requirements for pressure equipment and pressure components fabricated with additive manufacturing methods
20.60 Close of comment period