SBS Priority Topic 19: Testing methods
Draft European and International Standards on Testing Methods
Draft European and International Standards on Testing Methods
Manipulating industrial robots - Performance criteria and related testing methods - Part 2: Pose-to-pose comparison tests
30.97 End of interruption of work - split/merged
Manipulatiing industrial robots - Performance criteria and related testing methods - Part 3: Path comparison tests
30.97 End of interruption of work - split/merged
Non-destructive testing. Terminology. Part 2 : terms common to the non-destructive testing methods.
30.98 Project deleted
Space engineering – Star sensor terminology and performance specification
30.98 Project deleted
Railway applications - Current collection systems - Pantographs, testing methods for carbon contact strips
50.98 Project deleted
Low-voltage surge protective devices - Part 11: Surge protective devices connected to low-voltage power distribution systems - Performance requirements and testing methods
50.98 Project deleted
Low voltage surge protective devices - Part 21: Surge protective devices connected to telecommunications and signalling networks - Requirements and testing methods
40.60 Close of voting
Radio-frequency connectors - Part 1-3: Electrical test methods - Surge withstand - Surge protective devices built-in coaxial connector - Performance requirements and testing methods
30.20 CD study/ballot initiated
Low voltage surge protective devices - Part 21: Surge protective devices connected to telecommunications and signalling networks - Requirements and testing methods
40.60 Close of voting
Surge protective devices connected to Low-voltage power distribution systems - Performance requirements and testing methods. (To include new tests)
10.98 New project rejected
Semiconductor devices - Performance evaluation of autonomous vehicle detection system - Part 1: Optical performance testing methods of LiDAR device
10.98 New project rejected
Semiconductor devices - Performance evaluation of autonomous vehicle detection system - Part 2: Optical performance testing methods of thermal imaging device
10.98 New project rejected
Electric Energy Storage (EES) Systems - Part 2-3: Unit parameters and testing methods - Performance assessment test during site operation
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Amendment 2-f1 to IEC 61643-1: Surge protective devices connected to Low-voltage power distribution systems - Performance requirements and testing methods.
30.97 End of interruption of work - split/merged
Surge protective devices connected to Low-voltage power distribution systems - Performancerequirements and testing methods
30.97 End of interruption of work - split/merged
Amendment 2-f3 to IEC 61643-1: Surge protective devices connected to Low-voltage power distribution systems - Performance requirements and testing methods.
30.97 End of interruption of work - split/merged
Amendment 2-f4 to IEC 61643-1: Surge protective devices connected to Low-voltage power distribution systems - Performance requirements and testing methods.
30.97 End of interruption of work - split/merged
Amendment 2-f5 to IEC 61643-1: Surge protective devices connected to Low-voltage power distribution systems - Performance requirements and testing methods.
30.97 End of interruption of work - split/merged
Industrial Process Control System - Guideline for Evaluating the Performances of Process Control Systems - Part 2: Testing methods and procedures for specific PCS
10.98 New project rejected
Wood-based panels — Non destructive testing methods
00.98 Proposal for new project abandoned
Interior air of road vehicles — Part 9: Testing methods of road vehicles for sampling and determination of pollutants/pollutants concentrations in cabin interiors
10.98 New project rejected
In the catalogues and work programs of CEN, CENELEC, ETSI, ISO and IEC there are thousands of draft standards covering test methods, for virtually all SBS / SMEs priority sectors and topics.
Some ESOs or ISO and IEC technical bodies (TCs, SCs, WGs, etc) do specifically cover testing methods as a core standardisation subject.