prEN 15273-3

Railway applications - Gauges - Part 3: Infrastructure

Publication date:   Mar 16, 2023

General information

40.60 Close of voting   Jul 6, 2023

CEN

CEN/TC 256 Railway applications

European Norm

45.020   Railway engineering in general | 45.060.01   Railway rolling stock in general

Buying

  Draft

PDF - €63.42

  English  



Buy

Scope

This document:
— lists the formulae and the associated rules needed to calculate the infrastructure gauge;
— lists the various phenomena to be taken into account to determine the infrastructure gauge;
— defines a methodology that may be used to calculate the various profiles from these phenomena;
— lists the rules to determine the distance between the track centres;
— lists the rules to be complied with when building the platforms;
— lists the rules to determine the pantograph gauge;
— provides recommendations for the various profiles needed to install, verify and maintain infrastructures;
and is applicable for various track gauges.
This document is applicable to heavy rail networks using various track gauges. Other vehicles and networks are outside the scope of this document, but the rules may be applied to them with some adjustments and agreement of the share of responsibility between rolling stock and infrastructure.
This document is not applicable to the gauges “S” and “T” for track gauge 1 520 mm.

Related legislation

Legislation related to this standard

2016/797/EU

Directive (EU) 2016/797 of the European Parliament and of the Council of 11 May 2016 on the interoperability of the rail system within the European Union (Text with EEA relevance)

Life cycle

PREVIOUSLY

PUBLISHED
EN 15273-3:2013+A1:2016

NOW

IN_DEVELOPMENT
prEN 15273-3
40.60 Close of voting
Jul 6, 2023