ISO/PWI 23469

Bases for design of structures — Seismic actions for designing geotechnical works ISO/PWI 23469

General information

00.00 Proposal for new project received   May 25, 2022

ISO

ISO/TC 98/SC 3 Loads, forces and other actions

International Standard

Scope

ISO 23469:2005 provides guidelines for specifying seismic actions for designing geotechnical works, including buried structures (e.g. buried tunnels, box culverts, pipelines, and underground storage facilities), foundations (e.g. shallow and deep foundations, and underground diaphragm walls), retaining walls (e.g. soil retaining and quay walls), pile-supported wharves and piers, earth structures (e.g. earth and rockfill dams and embankments), gravity dams, landfill and waste sites.
The guidelines provided in ISO 23469:2005 are general enough to be applicable for both new and existing geotechnical works. However, for use in practice, procedures more specific to existing geotechnical works can be needed, such as those described for existing structures in ISO 13822.

Life cycle

PREVIOUSLY

PUBLISHED
ISO 23469:2005

NOW

IN_DEVELOPMENT
ISO/PWI 23469
00.00 Proposal for new project received
May 25, 2022