ISO/CD 24675-2

Railway Applications — Running time calculation for timetabling — Part 2: Distance-speed diagrams and speed curves ISO/CD 24675-2

General information

30.60 Close of voting/ comment period   Mar 8, 2024

ISO

ISO/TC 269/SC 3 Operations and services

International Standard

45.020   Railway engineering in general | 03.220.30   Transport by rail

Scope

In order to create punctual timetables, it is necessary to accurately calculate and plan out running time between stopping or passing points, headway between trains, train scheduling, rolling stock scheduling, driver and crew scheduling, operation scheduling in stations and depots and line / infrastructure capacity.
Among these values, shortest running time between stopping or passing points must be calculated first, as this is the basis of timetabling.
This document describes a practical procedure to create and verify distance-speed diagrams and speed curves using the parameters specified in ISO 24675-1. Shortest running time is obtained by numerically integrating the speed curves.
This enables railway infrastructure managers, railway operators and related organizations to calculate accurate running time at the stage of setting up feasible and punctual daily timetables, seasonal timetables, annual timetables, strategic timetables for long-term perspective, and other timetables of a railway system.
This document excludes running time calculation used for purposes other than timetabling.

Life cycle

NOW

IN_DEVELOPMENT
ISO/CD 24675-2
30.60 Close of voting/ comment period
Mar 8, 2024