IEC TS 61400-26-2:2014 ED1

Wind turbines - Part 26-2: Production-based availability for wind turbines IEC TS 61400-26-2:2014 ED1

Publication date:   Jun 4, 2014

General information

99.60 Withdrawal effective   May 29, 2019

IEC

TC 88

Technical Specification

27.180   Wind turbine energy systems

Buying

Replaced

Language in which you want to receive the document.

Scope

IEC TS 61400-26-2:2014 provides a framework from which production-based performance indicators of a wind turbine generator system can be derived. It unambiguously describes how data is categorised and provides examples of how the data can be used to derive performance indicators. The approach of this part of IEC 61400 is to expand the time allocation model, introduced in IEC TS 61400-26-1, with two additional layers for recording of the actual energy production and potential energy production associated with the concurrent time allocation. This document also includes informative annexes with:
- examples of determination of lost production,
- examples of algorithms for production-based indicators,
- examples of other performance indicators,
- examples of application scenarios.

Life cycle

NOW

WITHDRAWN
IEC TS 61400-26-2:2014 ED1
99.60 Withdrawal effective
May 29, 2019

REVISED BY

PUBLISHED
IEC 61400-26-1:2019 ED1