IEC 60255-22-5:2008 specifies the general requirements for surge immunity tests for measuring relays and protection equipment for power system protection, including the control, monitoring and process interface equipment used with those systems. Is based on IEC 61000-4-5. The objective of the tests is to confirm that the equipment under test will operate correctly when energized and subjected to high-energy disturbances on the power and interconnection lines, caused by surge voltages from switching and lightning effects. The main change in this new edition concerns line to earth tests.
WITHDRAWN
IEC 60255-22-5:2002 ED1
WITHDRAWN
IEC 60255-22-5:2008 ED2
99.60
Withdrawal effective
May 24, 2013
WITHDRAWN
IEC 60255-26:2013 ED3