Revised
Specifies the general requirements for surge tests for measuring relays and protection equipment for power system protection, including the control, monitoring and process interface equipment used with these systems. Is based on IEC 61000-4-5.
WITHDRAWN
IEC 60255-22-5:2002 ED1
99.60
Withdrawal effective
Nov 17, 2008
WITHDRAWN
IEC 60255-22-5:2008 ED2