IEC 60071-2:2018 ED4

Insulation co-ordination - Part 2: Application guidelines

Publication date:   Mar 16, 2018

General information

99.60 Withdrawal effective   May 24, 2023

IEC

TC 99

International Standard

29.080.30   Insulation systems

Buying

  Revised

PDF - €629.20

  English  



Buy

Scope

IEC 60071-2:2018 is now available as IEC 60071-2:2018 RLV which contains the International Standard and its Redline version, showing all changes of the technical content compared to the previous edition.
IEC 60071-2:2018 constitutes application guidelines and deals with the selection of insulation levels of equipment or installations for three-phase electrical systems. It gives guidance for the determination of the rated withstand voltages for ranges I and II of IEC 60071-1 and to justify the association of these rated values with the standardized highest voltages for equipment. It covers three-phase systems with nominal voltages above 1 kV. This edition includes the following significant technical changes with respect to the previous edition:
a) the annex on clearance in air to assure a specified impulse withstand voltage installation is deleted because the annex in IEC 60071-1 is overlapped;
b) 4.2 and 4.3 on surge arresters are updated;
c) 4.3.5 on very-fast-front overvoltages is revised. Annex J on insulation co-ordination for very-fast-front overvoltages in UHV substations is added;
d) Annex H on atmospheric correction – altitude correction is added.
e) Annex I on evaluation method of non-standard lightning overvoltage shape is added.
It has the status of a horizontal standard in accordance with IEC Guide 108.

Life cycle

PREVIOUSLY

WITHDRAWN
IEC 60071-2:1996 ED3

NOW

WITHDRAWN
IEC 60071-2:2018 ED4
99.60 Withdrawal effective
May 24, 2023

REVISED BY

PUBLISHED
IEC 60071-2:2023 ED5