IEC 60071-2:2018 ED4

Insulation co-ordination - Part 2: Application guidelines IEC 60071-2:2018 ED4

Publication date:   Mar 16, 2018

General information

99.60 Withdrawal effective   May 24, 2023

IEC

TC 99

International Standard

29.080.30   Insulation systems

Buying

Revised

Language in which you want to receive the document.

Scope

IEC 60071-2:2018 is now available as IEC 60071-2:2018 RLV which contains the International Standard and its Redline version, showing all changes of the technical content compared to the previous edition.
IEC 60071-2:2018 constitutes application guidelines and deals with the selection of insulation levels of equipment or installations for three-phase electrical systems. It gives guidance for the determination of the rated withstand voltages for ranges I and II of IEC 60071-1 and to justify the association of these rated values with the standardized highest voltages for equipment. It covers three-phase systems with nominal voltages above 1 kV. This edition includes the following significant technical changes with respect to the previous edition:
a) the annex on clearance in air to assure a specified impulse withstand voltage installation is deleted because the annex in IEC 60071-1 is overlapped;
b) 4.2 and 4.3 on surge arresters are updated;
c) 4.3.5 on very-fast-front overvoltages is revised. Annex J on insulation co-ordination for very-fast-front overvoltages in UHV substations is added;
d) Annex H on atmospheric correction – altitude correction is added.
e) Annex I on evaluation method of non-standard lightning overvoltage shape is added.
It has the status of a horizontal standard in accordance with IEC Guide 108.

Life cycle

PREVIOUSLY

WITHDRAWN
IEC 60071-2:1996 ED3

NOW

WITHDRAWN
IEC 60071-2:2018 ED4
99.60 Withdrawal effective
May 24, 2023

REVISED BY

PUBLISHED
IEC 60071-2:2023 ED5