EN IEC 62381:2024

Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)

Publication date:   Nov 14, 2024

General information

60.60 Standard published   Sep 13, 2024

CENELEC

CLC/TC 65X Industrial-process measurement, control and automation

European Norm

25.040.40   Industrial process measurement and control

Buying

  Published

PDF - €61.76

  English  



Buy

Scope

IEC 62381:2024 defines requirements and checklists for the factory acceptance test (FAT), the factory integration test (FIT), the site acceptance test (SAT), and the site integration test (SIT). These tests are carried out to demonstrate that the automation system meets the requirements of the applicable specification. This document provides a means for all parties, including the owner, the buyer, and the vendor, to clearly establish and agree on the scope of activities and responsibilities involved in performing these tests in order to achieve a timely delivery and acceptance of the automation system. The activities specified in this document can be used to develop test plans adapted to the specific requirements of the process/plant/equipment. The annexes of this document contain checklists which are available for consideration when preparing specific test procedures and documentation for a specific automation system.

This edition includes the following significant technical changes with respect to the previous edition:

a) General re-organization of the standard;

b) Current technology incorporated;

c) Optional factory integration test (FIT) added;

d) Replaced the forms in the annexes with detailed checklists of activities which can be used to develop project-specific test plans; and

e) Provided additional references to other applicable standards.

Life cycle

PREVIOUSLY

PUBLISHED
EN 62381:2012

NOW

PUBLISHED
EN IEC 62381:2024
60.60 Standard published
Sep 13, 2024