FprEN 17928-1

Gas infrastructure - Injection stations - Part 1: General requirements FprEN 17928-1

Publication date:   Apr 11, 2024

General information

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks   Apr 11, 2024

CEN

CEN/TC 234 Gas infrastructure

European Norm

75.200   Petroleum products and natural gas handling equipment

Buying

Draft

Language in which you want to receive the document.

Scope

This document establishes the functional requirements for stations for the injection of biomethane, substitute natural gas (SNG) and hydrogen fuel gas into gas transmission and distribution systems operated with fuel gases (natural gas, biomethane, SNG, hydrogen fuel gas, fuel gas mixtures) in accordance with European technical rules that ensure the interoperability of systems.
Figure 1 describes the general approach including all the relevant functions that can be installed in different configurations.
This document also applies to refeeding stations that feed such gases back into upstream gas supply networks; see Figure 2.
This document represents the state of the art at the time of its preparation.
This document does not apply to injection stations operating prior to the publication of this document.
This document specifies common basic principles for gas infrastructure. Users of this document are expected to be aware that more detailed national standards and/or codes of practice can exist in the CEN member countries. This document is intended to be applied in association with these national standards and/or codes of practice setting out the above-mentioned basic principles.
In the event of terms of additional requirements in national legislation/regulation than in this document, CEN/TR 13737 (all parts) illustrates these terms.
CEN/TR 13737 (all parts) gives:
- legislation/regulations applicable in a member state;
- if appropriate, more restrictive national requirements;
- a national contact point for the latest information.

Life cycle

NOW

IN_DEVELOPMENT
FprEN 17928-1
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Apr 11, 2024