FprEN 12953-6

Shell Boilers - Part 6: Requirements for equipment for the boiler FprEN 12953-6

Publication date:   Jun 1, 2023

General information

45.99 Dispatch of FV draft to CCMC   Mar 8, 2024

CEN

CEN/TC 269 Shell and water-tube boilers

European Norm

27.060.30   Boilers and heat exchangers

Buying

Draft

Language in which you want to receive the document.

Scope

This part of this European Standard specifies the minimum requirements for safety related equipment for shell boilers as defined in EN 12953-1, to ensure the boiler operates within the allowable limits (pressure, temperature, etc.) and if the limits are exceeded the energy supply shall be interrupted and locked out without manual (human) intervention at the boiler.
NOTE 1 The maximum time of operation without manual (human) intervention should be defined for each boiler system.
NOTE 2 Annex C (informative) gives recommendations of operation and testing of the boiler system with a maximum time of operation without manual (human) intervention of 72 hours.

Related legislation

Legislation related to this standard

2014/68/EU

Directive 2014/68/EU of the European Parliament and of the Council of 15 May 2014 on the harmonisation of the laws of the Member States relating to the making available on the market of pressure equipment

Life cycle

PREVIOUSLY

PUBLISHED
EN 12953-6:2011

NOW

IN_DEVELOPMENT
FprEN 12953-6
45.99 Dispatch of FV draft to CCMC
Mar 8, 2024