99.60 Withdrawal effective Mar 28, 2015
CENELEC
CLC/TC 65X Industrial-process measurement, control and automation
European Norm
25.040.40 Industrial process measurement and control | 35.100.70 Application layer
It provides user programs with a means to access the fieldbus communication environment. In this respect, the FAL can be viewed as a 'window between corresponding application programs.' This standard provides common elements for basic time-critical and non-time-critical messaging communications between application programs in an automation environment and material specific to Type 2 fieldbus. The term 'time-critical' is used to represent the presence of a time-window, within which one or more specified actions are required to be completed with some defined level of certainty. Failure to complete specified actions within the time window risks failure of the applications requesting the actions, with attendant risk to equipment, plant and possibly human life. It includes the following significant changes from the previous edition deletion of the former Type 6 fieldbus for lack of market relevance; addition of new types of fieldbuses; partition of part 6 of the third edition into multiple parts numbered.
WITHDRAWN
EN 61158-6:2004
WITHDRAWN
EN 61158-6-14:2008
99.60
Withdrawal effective
Mar 28, 2015
WITHDRAWN
EN 61158-6-14:2012