EN 50518-1:2010

Monitoring and alarm receiving centre - Part 1: Location and construction requirements

Publication date:   Jun 17, 2010

General information

99.60 Withdrawal effective   Oct 7, 2016

CENELEC

CLC/TC 79 Alarm systems

European Norm

13.320   Alarm and warning systems

Buying

  Withdrawn

PDF - €31.61

  English   Bulgarian  



Buy

Scope

This Part 1 of EN 50518 specifies the minimum requirements for the design, construction, and functioning equipment for premises where the monitoring, receiving and processing of (alarm) signals generated by alarm systems takes place as an integrated part of the total safety and security process. The requirements apply for applications in a remote configuration where multiple systems report to a single or multiple Alarm Receiving Centre(s) (ARC) as well as to a single site facility aimed for the monitoring and processing of alarms generated by one or more alarm systems installed within the perimeter of that particular site.

Life cycle

NOW

WITHDRAWN
EN 50518-1:2010
99.60 Withdrawal effective
Oct 7, 2016

CORRIGENDA / AMENDMENTS

WITHDRAWN
EN 50518-1:2010/corrigendum Aug. 2010

REVISED BY

WITHDRAWN
EN 50518-1:2013