EN 50518-1:2013

Monitoring and alarm receiving centre - Part 1: Location and construction requirements EN 50518-1:2013

Publication date:   Mar 17, 2014

General information

99.60 Withdrawal effective   Feb 6, 2022

CENELEC

CLC/TC 79 Alarm systems

European Norm

13.320   Alarm and warning systems

Buying

Withdrawn

Language in which you want to receive the document.

Scope

This part of EN 50518 specifies the minimum requirements for the design, construction, and functioning equipment for premises where the monitoring, receiving and processing of (alarm) signals generated by one or more intruder and hold-up alarm systems takes place as an integrated part of the total safety and security process. The requirements apply for applications in a remote configuration where multiple systems report to a single or multiple Alarm Receiving Centre(s) (ARC) as well as to a single site facility aimed for the monitoring and processing of alarms generated by one or more alarm systems installed within the perimeter of that particular site. This part of EN 50518 is to be read in conjunction with Part 2 and Part 3, and cannot be used separately.

Life cycle

PREVIOUSLY

WITHDRAWN
EN 50518-1:2010

NOW

WITHDRAWN
EN 50518-1:2013
99.60 Withdrawal effective
Feb 6, 2022

REVISED BY

PUBLISHED
EN 50518:2019