EN 14373:2021/FprA1

Explosion suppression systems

Publication date:   Oct 3, 2024

General information

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks   Oct 3, 2024

CEN

CEN/TC 305 Potentially explosive atmospheres - Explosion prevention and protection

European Norm

13.230   Explosion protection

Buying

  Draft

PDF - €4.46

  English  



Buy

Scope

This document describes the basic requirements for the design and application of explosion suppression systems. This document also specifies test methods for evaluating the effectiveness and the scaling up of explosion suppression systems against defined explosions. This document covers:
- general requirements for explosion suppression system parts;
- evaluating the effectiveness of an explosion suppression system;
- evaluating the scale up of an explosion suppression system to larger than tested volumes;
- development and evaluation of design tools for explosion suppression systems;
- installation, operation and maintenance instructions for an explosion suppression system.
This document is applicable only to explosion suppression systems intended for the protection of closed, or essentially closed, enclosures in which an explosion could result as a consequence of ignition of an explosible mixture, e.g. dust-air, gas(vapour)-air, dust-gas(vapour)-air and mist-air.
This document is not applicable for explosions of materials listed below, or for mixtures containing some of those materials:
- unstable materials that are liable to dissociate;
- explosive materials;
- pyrotechnic materials;
- pyrophoric materials.

Related legislation

Legislation related to this standard

2014/34/EU

Directive 2014/34/EU Of The European Parliament And Of The Council of 26 February 2014 on the harmonisation of the laws of the Member States relating to equipment and protective systems intended for use in potentially explosive atmospheres (recast)

Life cycle

PREVIOUSLY

PUBLISHED
EN 14373:2021

NOW

IN_DEVELOPMENT
EN 14373:2021/FprA1
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Oct 3, 2024