CEN/TS 15427-1-2:2021

Railway applications - Wheel/Rail friction management - Part 1-2: Equipment and Application - Top of Rail materials CEN/TS 15427-1-2:2021

Publication date:   Jul 15, 2021

General information

99.60 Withdrawal effective   Oct 11, 2023

CEN

CEN/TC 256 Railway applications

Technical Specification

21.260   Lubrication systems | 45.080   Rails and railway components | 45.120   Equipment for railway/cableway construction and maintenance

Buying

Withdrawn

Language in which you want to receive the document.

Scope

This document is limited to specifying the requirements when applying material to the active interface between the wheel tread and the crown of the rail and includes trainborne and track side equipment.
This document only covers the equipment and application of material to the active interface.
This document defines:
- the characteristics that systems of top of rail equipment for wheel-rail interface shall achieve, together with applicable inspection and test methods to be carried out for verification;
- all relevant terminology which is specific to the application of top of rail materials of the wheel-rail interface.
This document only applies to the mainline railway.
NOTE This document can also be used for other railways, e.g. urban rail.

Life cycle

NOW

WITHDRAWN
CEN/TS 15427-1-2:2021
99.60 Withdrawal effective
Oct 11, 2023

REVISED BY

PUBLISHED
CEN/TS 15427-1-2:2023