Use the form below to find particular standards or projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”. You can also search using the Advance Search facility.
Eurocode 1 - Actions on structures - Part 4: Silos and tanks
40.20 DIS ballot initiated: 12 weeks
Eurocode 3: Design of steel structures - Part 1-10: Material toughness and through-thickness properties
45.99 Dispatch of FV draft to CCMC
Eurocode 3 - Design of steel structures - Part 1-11: Tension components
40.20 DIS ballot initiated: 12 weeks
Eurocode 3 - Design of steel structures - Part 1-12: Additional rules for steel grades up to S960
00.60 Close of review
Eurocode 3 - Design of steel structures - Part 1-14: Design assisted by finite element analysis
40.60 Close of voting
Eurocode 3 - Design of steel structures - Part 1-4: Stainless steel structures
45.99 Dispatch of FV draft to CCMC
Eurocode 3 - Design of steel structures - Part 1-6: Strength and stability of shell structures
45.99 Dispatch of FV draft to CCMC
Eurocode 3 - Design of steel structures - Part 1-7: Plate assemblies with elements under transverse loads
45.99 Dispatch of FV draft to CCMC
Eurocode 3: Design of steel structures - Part 1-9: Fatigue
45.99 Dispatch of FV draft to CCMC
Eurocode 3 - Design of steel structures - Part 2: Bridges
40.20 DIS ballot initiated: 12 weeks
Eurocode 3 - Design of steel structures - Part 3: Towers, masts and chimneys
40.20 DIS ballot initiated: 12 weeks
Eurocode 3 - Design of steel structures - Part 4-1: Silos
40.20 DIS ballot initiated: 12 weeks
Eurocode 3 - Design of steel structures - Part 4-2: Tanks
40.20 DIS ballot initiated: 12 weeks
Eurocode 3 - Design of steel structures - Part 6: Crane supporting structures
40.20 DIS ballot initiated: 12 weeks
Eurocode 4 - Design of composite steel and concrete structures - Part 1-1: General rules and rules for buildings
40.20 DIS ballot initiated: 12 weeks
Eurocode 4 - Design of composite steel and concrete structures - Part 1-2: Structural fire design
40.20 DIS ballot initiated: 12 weeks