Use the form below to find particular standards or projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”. You can also search using the Advance Search facility.
Plastics hoses and hose assemblies for suction and low-pressure discharge of petroleum liquids - Specification (ISO 6808:2014)
60.60 Standard published
Methodology for methane emissions quantification for gas transmission, distribution and storage systems and LNG terminals
50.60 Close of voting. Proof returned by secretariat
Gas infrastructure - Injection stations - Part 1: General requirements
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Gas infrastructure - Injection stations - Part 2: Specific requirements regarding the injection of biomethane
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Gas infrastructure - Injection stations - Part 3: Specific requirements regarding the injection of hydrogen
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Natural gas vehicles - LNG vehicle fuelling procedures
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Oil and gas industries including lower carbon energy - Internal coating and lining of steel storage tanks (ISO/FDIS 16961:2024)
50.60 Close of voting. Proof returned by secretariat
Thermoplastic and flexible metal pipework for underground installation at petrol filling stations
40.60 Close of voting
Petroleum and natural gas industries - Pipeline transportation systems (ISO 13623:2017, modified)
40.60 Close of voting
Petroleum and natural gas industries - Pipeline transportation systems - Welding of pipelines (ISO 13847:2013, modified)
40.60 Close of voting
Oil and gas industries including lower carbon energy - Pipeline transportation systems - Recommended practice for pipeline life extension (ISO/DIS 12747:2024)
40.20 DIS ballot initiated: 12 weeks
Plastics piping systems for the supply of gaseous fuels - Unplasticized polyamide (PA-U) piping systems with fusion jointing and mechanical jointing - Part 2: Pipes (ISO/DIS 16486‑2:2024)
40.20 DIS ballot initiated: 12 weeks
Plastics piping systems for the supply of gaseous fuels - Unplasticized polyamide (PA-U) piping systems with fusion jointing and mechanical jointing - Part 3: Fittings (ISO/DIS 16486‑3:2024)
40.20 DIS ballot initiated: 12 weeks
LNG tank wagon/container loading & unloading (ISO/DIS 5124:2023)
40.60 Close of voting
Gas cylinders — Refillable welded steel cylinders for liquefied petroleum gas (LPG) — Periodic inspection and testing
90.20 Standard under periodical review
Plastics piping systems for renovation of underground gas supply networks — Part 1: General
90.92 Standard to be revised
Plastics piping systems for renovation of underground gas supply networks — Part 2: Lining with continuous pipes
90.92 Standard to be revised