Use the form below to find particular standards or projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”. You can also search using the Advance Search facility.
Wall-hung urinals - Functional requirements and test methods
40.60 Close of voting
Water conditioning equipment inside buildings - Mechanical filters - Part 1: Particle rating 80 µm to 150 µm - Requirements for performances, safety and testing
50.60 Close of voting. Proof returned by secretariat
Water conditioning equipment inside buildings - Mechanical filters - Part 2: Particle rating 1 µm to less than 80 µm - Requirements for performance, safety and testing
50.60 Close of voting. Proof returned by secretariat
Plastics piping systems for non-pressure underground drainage and sewerage - Structured-wall piping systems of unplasticized poly(vinyl chloride) (PVC-U), polypropylene (PP) and polyethylene (PE) - Part 3: Specifications for pipes and fittings with smooth internal and profiled external surface and the system, Type B
50.60 Close of voting. Proof returned by secretariat
Fire classification of construction products and building elements - Part 2: Classification using data from fire resistance and/or smoke control tests, excluding ventilation services
00.60 Close of review
Fire classification of construction products and building elements - Part 6: Classification using data from reaction to fire tests on power, control and communication cables
50.60 Close of voting. Proof returned by secretariat
Investigation and assessment of drain and sewer systems outside building - Part 2: Visual inspection coding system
50.60 Close of voting. Proof returned by secretariat
External blinds - Performance requirements including safety
50.60 Close of voting. Proof returned by secretariat
Fixed firefighting systems - Foam systems - Part 1: Requirements and test methods for components
50.60 Close of voting. Proof returned by secretariat
Shutters - Performance requirements including safety
50.60 Close of voting. Proof returned by secretariat
Fire resistance tests for service installations - Part 10: Smoke control dampers
50.60 Close of voting. Proof returned by secretariat
Fire resistance tests for service installations - Part 10: Smoke control dampers
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Fire resistance tests for service installations - Part 11: Fire protective systems for cable systems and associated components
50.60 Close of voting. Proof returned by secretariat
Fire resistance tests for service installations - Part 1: Ventilation ducts
50.60 Close of voting. Proof returned by secretariat
Fire resistance tests for service installations - Part 12: Non-mechanical fire barrier for ventilation ductwork
40.60 Close of voting
Fire resistance tests for service installations - Part 3: Penetration seals
40.60 Close of voting
Fire resistance tests for service installations - Part 4: Linear joint seals
50.60 Close of voting. Proof returned by secretariat
Precast concrete products - Special roof elements
50.60 Close of voting. Proof returned by secretariat