Standards search

Use the form below to find particular standards or projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”. You can also search using the Advance Search facility.

Uninterruptible power systems (UPS) - Part 3: Method of specifying the performance and test requirements

60.60 Standard published

CLC/TC 22X

Safety requirements for power electronic converter systems and equipment - Part 1: General

60.60 Standard published

CLC/TC 22X

Safety requirements for power electronic converter systems and equipment - Part 1: General

60.60 Standard published

CLC/TC 22X

Safety requirements for power electronic converter systems and equipment - Part 2: Power electronic converters from 1 000 V AC or 1 500 V DC up to 36 kV AC or 54 kV DC

60.60 Standard published

CLC/TC 22X

Voltage sourced converter (VSC) valves for high-voltage direct current (HVDC) power transmission - Electrical testing

40.60 Close of voting

CLC/TC 22X

Bi-directional grid-connected power converters - Part 1: General requirements

60.60 Standard published

CLC/TC 22X

Bi-directional grid-connected power converters - Part 2: Interface of GCPC and distributed energy resources

60.60 Standard published

CLC/TC 22X

Adjustable speed electrical power drive systems (PDS) - Part 9-2: Ecodesign for motor systems - Energy efficiency determination and classification

60.55 Ratification completed (DOR)

CLC/TC 22X

Ecodesign for power electronics including approach for environmental product declarations and specifications for the material efficiency assessment

10.99 New project approved

CLC/TC 22X

Low-voltage switch mode power supplies - Part 3: Electromagnetic compatibility (EMC)

10.99 New project approved

CLC/TC 22X

Adjustable speed electrical power drive systems - Part 9-1: Ecodesign for power drive systems, motor starters, power electronics and their driven applications - General requirements for setting energy efficiency standards for power driven equipment using the extended product approach (EPA) and semi analytic model (SAM)

40.60 Close of voting

CLC/TC 22X

Determination of power losses in high-voltage direct current (HVDC) converter stations

10.99 New project approved

CLC/TC 22X

Uninterruptible power systems (UPS) - Part 1: Safety requirements

10.99 New project approved

CLC/TC 22X

Uninterruptible power systems (UPS) - Part 5-1: DC output UPS - Safety requirements

10.99 New project approved

CLC/TC 22X

Uninterruptible power systems (UPS) - Part 5-1: DC output UPS - Safety requirements

10.99 New project approved

CLC/TC 22X

Static transfer systems (STS) - Part 1: General and safety requirements

10.99 New project approved

CLC/TC 22X

Safety requirements for power electronic converter systems and equipment - Part 2: Power electronic converters from 1 000 v AC or 1 500 v DC up to 36 kv AC or 54 kv DC

10.99 New project approved

CLC/TC 22X

Bi-directional grid connected power converters - Part 1: General and safety requirements

10.99 New project approved

CLC/TC 22X