Projects

Use the form below to find particular standards or projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”. You can also search using the Advance Search facility.

Automatic electrical controls-Part 2-24: Particular requirements for displacement sensing controls

10.99 New project approved

CLC/TC 72

Automatic electrical controls -Part 2-25: Particular requirements for current sensing controls

10.99 New project approved

CLC/TC 72

Automatic electrical controls - Part 2-6: Particular requirements for automatic electrical pressure sensing controls including mechanical requirements

10.99 New project approved

CLC/TC 72

Automatic electrical controls - Part 2-8: Particular requirements for electrically operated water valves, including mechanical requirements

10.99 New project approved

CLC/TC 72

Shunt power capacitors of the non-self-healing type for a.c. systems having a rated voltage up to and including 1000 v - Part 1: General - Performance, testing and rating - Safety requirements - Guide for installation and operation

10.99 New project approved

CLC/SR 33

Low-voltage switchgear and controlgear - Part 1: General rules

10.99 New project approved

CLC/TC 121A

Low-voltage switchgear and controlgear - Part 2: Circuit-breakers

40.60 Close of voting

CLC/TC 121A

Low-voltage switchgear and controlgear - Part 6-1: Multiple function equipment - Transfer switching equipment

10.99 New project approved

CLC/TC 121A

Electromagnetic compatibility (EMC) - Part 2-4: Environment - Compatibility levels in power distribution systems in industrial locations for low-frequency conducted disturbances

40.60 Close of voting

CLC/TC 210

Electromagnetic compatibility (EMC) - Part 4-2: Testing and measurement techniques - Electrostatic discharge immunity test

10.99 New project approved

CLC/TC 210

Electromagnetic compatibility (EMC) - Part 4-29: Testing and measurement techniques - Voltage dips, short interruptions and voltage variations on d.c. input power port immunity tests

10.99 New project approved

CLC/TC 210

Electromagnetic compatibility (EMC) - Part 4-30: Testing and measurement techniques - Power quality measurement methods

10.99 New project approved

CLC/TC 210

Electromagnetic compatibility (EMC) - Part 4-4: Testing and measurement techniques - Electrical fast transient/burst immunity test

10.99 New project approved

CLC/TC 210

Safety requirements for electrical equipment for measurement, control, and laboratory use - Part 2-201: Particular requirements for control equipment

40.60 Close of voting

CLC/TC 65X

Low-voltage switch mode power supplies - Part 3: Electromagnetic compatibility (EMC)

10.99 New project approved

CLC/TC 22X

Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-6: Particular requirements - In vitro diagnostic (IVD) medical equipment

40.60 Close of voting

CLC/TC 65X

Low-voltage switchgear and controlgear assemblies - Part 6: Busbar trunking systems (busways)

10.99 New project approved

CLC/SR 121B

Electric vehicle conductive charging system - Part 21-2: Electric vehicle requirements for conductive connection to an AC/DC supply - EMC requirements for off board electric vehicle charging systems

10.99 New project approved

CLC/TC 69X