Use the form below to find particular standards or projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”. You can also search using the Advance Search facility.
Piston-operated volumetric apparatus - Part 3: Burettes (ISO 8655-3:2022)
60.60 Standard published
Piston-operated volumetric apparatus - Part 4: Dilutors (ISO 8655-4:2022)
60.60 Standard published
Piston-operated volumetric apparatus - Part 5: Dispensers (ISO 8655-5:2022)
60.60 Standard published
Piston-operated volumetric apparatus - Part 6: Gravimetric reference measurement procedure for the determination of volume (ISO 8655-6:2022, Corrected version 2022-06)
60.60 Standard published
Piston-operated volumetric apparatus - Part 7: Alternative measurement procedures for the determination of volume (ISO 8655-7:2022, Corrected version 2023-01)
60.60 Standard published
Piston-operated volumetric apparatus - Part 7: Alternative measurement procedures for the determination of volume - Amendment 1 (ISO 8655-7:2022/DAmd 1:2024
40.60 Close of voting
Piston-operated volumetric apparatus - Part 8: Photometric reference measurement procedure for the determination of volume (ISO 8655-8:2022)
60.60 Standard published
Piston-operated volumetric apparatus - Part 9: Manually operated precision laboratory syringes (ISO 8655-9:2022)
60.60 Standard published
Biological safety cabinets - Part 1: Classes and basic requirements
30.99 CD approved for registration as DIS
Biological safety cabinets - Part 2: BSC class II
30.99 CD approved for registration as DIS
Biological safety cabinets - Part 5: Installation, commissioning and routine testing
30.99 CD approved for registration as DIS
Laboratory furniture Recommendations for design and installation - Part 1: General
10.99 New project approved
Emergency safety showers - Part 1: Plumbed-in body showers for laboratories
10.99 New project approved
Emergency safety showers - Part 2: Plumbed-in eye wash units
10.99 New project approved
Laboratory local exhaust devices - Part 2: Commissioning and On-site Testing
10.99 New project approved