Use the form below to find particular standards or projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”. You can also search using the Advance Search facility.
Fire-resistance tests — Elements of building construction — Part 7: Specific requirements for columns
90.92 Standard to be revised
Fire-resistance tests — Elements of building construction — Part 8: Specific requirements for non-loadbearing vertical separating elements
90.93 Standard confirmed
Fire-resistance tests — Elements of building construction — Part 8: Specific requirements for non-loadbearing vertical separating elements — Technical Corrigendum 1
60.60 Standard published
Fire-resistance tests — Elements of building construction — Part 9: Specific requirements for non-loadbearing ceiling elements
90.20 Standard under periodical review
Fire-resistance tests — Elements of building construction — Part 9: Specific requirements for non-loadbearing ceiling elements — Technical Corrigendum 1
60.60 Standard published
Fire-resistance tests — Part 2: Lift landing door assemblies
20.00 New project registered in TC/SC work programme
Fire tests — Smoke-control door and shutter assemblies
20.00 New project registered in TC/SC work programme
Guidance on the calculation of asymmetrical partitions/vertical membranes with respect to their fire resistance performance
20.00 New project registered in TC/SC work programme
Determination of the resistance to jet fires of passive fire protection — Part 2: Guidance on test method selection and implementation methods
30.60 Close of voting/ comment period
Determination of the resistance to gas explosions of passive fire protection materials — Part 2: Divisional substrates
30.60 Close of voting/ comment period
Determination of the resistance to gas explosions of passive fire protection materials — Part 3: Tubular and I-section substrates subject to elastic deformation only
30.60 Close of voting/ comment period
Fire resistance tests — Door and shutter assemblies — Part 1: General requirements
30.99 CD approved for registration as DIS
Determination of the resistance to jet fires of passive fire protection materials — Part 3: extended test requirements
40.20 DIS ballot initiated: 12 weeks
Fire-resistance tests — Elements of building construction — Part 1: General requirements
40.20 DIS ballot initiated: 12 weeks
Fire-resistance tests — Elements of building construction — Part 7: Specific requirements for columns
40.20 DIS ballot initiated: 12 weeks
Fire containment — Elements of building construction — Part 1: Ventilation ducts
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Fire-resistance tests-Elements of building construction — Part 1: General requirements
10.20 New project ballot initiated
Fire tests for building elements and components — Fire testing of service installations — Part 3: Single component penetration seals — Guidance on the construction and use of test configurations and simulated services to characterise sealing materials
60.60 Standard published