Use the form below to find particular standards or projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”. You can also search using the Advance Search facility.
Plastics piping systems for renovation of underground gas supply networks — Part 3: Lining with close-fit pipes
90.92 Standard to be revised
Plastics piping systems for the trenchless replacement of underground pipeline networks — Part 1: Replacement on the line by pipe bursting and pipe extraction
90.92 Standard to be revised
Plastics piping systems for the trenchless replacement of underground pipeline networks — Part 2: Replacement off the line by horizontal directional drilling and impact moling
90.92 Standard to be revised
Piping systems for rehabilitation of underground drainage, sewerage and water supply networks — Part 4: Thermoplastic composite materials
20.00 New project registered in TC/SC work programme
Plastics piping systems used for the rehabilitation of pipelines — Classification and overview of strategic, tactical and operational activities
30.99 CD approved for registration as DIS
Plastics piping systems for renovation of underground water supply networks — Part 11: Lining with inserted hoses
30.60 Close of voting/ comment period
Piping systems for rehabilitation of underground drainage, sewerage and water supply networks — Part 1: Polyethylene (PE) material
30.60 Close of voting/ comment period
Piping systems for rehabilitation of underground drainage, sewerage and water supply networks — Part 2: Thermoset composite materials
30.60 Close of voting/ comment period
Piping systems for rehabilitation of underground drainage, sewerage and water supply networks — Part 3: Unplasticized poly (vinyl chloride) (PVC-U) material
30.60 Close of voting/ comment period
Piping systems for rehabilitation of underground gas supply networks — Part 1: Polyethylene (PE) material
30.60 Close of voting/ comment period
Assessment of conformity of plastics piping systems for the rehabilitation of existing pipelines — Part 1: Polyethylene (PE) material
30.20 CD study/ballot initiated
Assessment of conformity of plastics piping systems for the rehabilitation of existing pipelines — Part 3: Unplasticised poly(vinyl chloride) (PVC-U) material
30.20 CD study/ballot initiated
Assessment of conformity of plastics piping systems for the rehabilitation of existing pipelines — Part 2: Thermoset composite materials
10.20 New project ballot initiated
Piping systems for rehabilitation of underground gas supply networks — Part 5: Polyamide (PA-U) material
00.00 Proposal for new project received
Assessment of conformity of plastics piping systems for the rehabilitation of existing pipelines — Part 4: Thermoplastic composite materials
00.00 Proposal for new project received
Assessment of conformity of plastics piping systems for the rehabilitation of existing pipelines — Part 5: Polyamide (PA- U) material
00.00 Proposal for new project received
Assessment of conformity of plastics piping systems for the rehabilitation of existing pipelines — Part 1: Polyethylene (PE) material
90.92 Standard to be revised
Assessment of conformity of plastics piping systems for the rehabilitation of existing pipelines — Part 2: Resin-fibre composite (RFC) material
60.60 Standard published