prEN IEC 63189-1

Virtual power plants - Part 1: Architecture and functional requirements

General information

30.98   Project deleted   Jul 23, 2021

CENELEC

CLC/TC 8X System aspects of electrical energy supply

European Norm

29.240.01   Power transmission and distribution networks in general

Scope

IEC TS 63189-1:2023 covers the terms and definitions, system composition and control modes of virtual power plant (VPP). It defines the functional requirements for VPPs, including power generation forecasting, load forecasting, generation and consumption scheduling, control and management of energy storage devices and loads, coordinated optimization of distributed energy resources, status monitoring and communication, data collection and analysis, and market transactions.

Since a virtual power plant is a cluster of dispersed energy converting installations, which are aggregated, it uses additional systems to achieve its objectives (e.g. regional energy meteorology forecasting, site specific energy management systems, SCADA and other communication systems).

Local regulations, the electricity market model and the corresponding manner of organising the market related to the utilisation of controllable DER affect the management, control and operation of VPPs.

Life cycle

NOW

ABANDON
prEN IEC 63189-1
30.98 Project deleted
Jul 23, 2021