prEN 50XXX

prEN: 1) Scope 2) Definitions 3) Fundamental requirements 4) Insulation 5) Equipment 6) Installations 7) Safety measures 8) Auxiliary installations and control systems 9) Earthing systems 10) Inspection and testing on site before taking over

General information

30.98   Project deleted   Feb 16, 1990

CENELEC

CLC/TC 99X Power installations exceeding 1 kV a.c. (1,5 kV d.c.)

European Norm

Life cycle

NOW

ABANDON
prEN 50XXX
30.98 Project deleted
Feb 16, 1990