prEN 1538

Execution of special geotechnical work - Diaphragm walls prEN 1538

Publication date:   Sep 3, 2026

General information

40.20   DIS ballot initiated: 12 weeks   Sep 3, 2026

CEN

CEN/TC 288 Execution of special geotechnical works

European Norm

93.020   Earthworks. Excavations. Foundation construction. Underground works

Buying

Draft

Language in which you want to receive the document.

Scope

This European Standard establishes general principles for the execution of diaphragm walls as either retaining walls or cut-off walls.
NOTE 1 This standard covers only structures constructed in a trench excavated with a support fluid or in dry conditions, where soil is removed and replaced by concrete or slurry and with wall thickness B ≥ 40 cm.
NOTE 2 Diaphragm walls can be permanent or temporary structures.
NOTE 3 The following types of structure are considered:
a) retaining walls: usually constructed to support the sides of an excavation in the ground. They include:
1) cast in situ concrete diaphragm walls;
2) precast concrete diaphragm walls;
3) reinforced slurry walls;
b) cut-off walls: usually constructed to prevent migration of groundwater, clear or polluted, or of other contaminants present in the ground. They include:
1) slurry walls (possibly with membranes or sheet piles);
2) plastic concrete walls.
NOTE 4 Walls formed shallow vertical trenches (typically excavations with a ratio of depth over thickness D/B < 5 or D < 5 m) are not covered by this standard.

Life cycle

PREVIOUSLY

PUBLISHED
EN 1538:2010+A1:2015

NOW

IN_DEVELOPMENT
prEN 1538
40.20 DIS ballot initiated: 12 weeks
Sep 3, 2026




Access Genorma App Everywhere

Get fast and easy access to top European and International standards (EN, ISO, IEC) via your mobile phone, tablet or the web.