prEN 13637

Building hardware - Electrically controlled exit systems for use on escape routes - Requirements and test methods prEN 13637

General information

40.98   Project deleted   Dec 9, 2011

CEN

CEN/TC 33 Doors, windows, shutters, building hardware and curtain walling

European Norm

91.190   Building accessories

Scope

This European standard specifies requirements for the manufacture, performance and testing of electrically controlled escape exit systems, specifically designed for use in an emergency situation on escape routes.
These systems consist of at least the following elements:
 Requesting element for requesting the release of electrical locking element in order to exit;
 Electrical locking element for securing an emergency exit door;
 Electrical controlling element for supplying, connecting and controlling electrical locking element and requesting element.
 In addition, these electrically controlled escape exit systems can include time delay and/or denied egress mode.
This European Standard covers escape exit systems placed on the market as a complete unit (e.g. mortise lock, lever handle, cylinder, keeper, requesting element, electrical locking element, electrical controlling element, etc.). The components are tested as a single product.
NOTE 1 The suitability of a time delay and/or egress mode should be defined according to local regulations.
NOTE 2 The suitability of an electrically controlled escape exit system for use on fire/smoke resisting door assemblies is determined by fire performance tests conducted in addition to the performance tests required by this European Standard. Annex B indicates additional requirements for these products.
NOTE 3 This European Standard covers electrically controlled escape exit systems which are either manufactured and placed on the market in their entirety by one producer or assembled from sub-assemblies produced by more than one producer and subsequently placed on the market as a kit in a single transaction. This doesn’t preclude components being delivered separately. The manufacturer is responsible for making it clear in a ‘list of components’ as part of the manufacturer’s compulsory installations which combination of components is covered by the ITT.

Related legislation

Legislation related to this standard

89/106/EEC

Construction products

305/2011

Regulation (eu) No 305/2011 of the European Parliament and of the Council of 9 march 2011 laying down harmonised conditions for the marketing of construction products and repealing council directive 89/106/eec

Life cycle

NOW

ABANDON
prEN 13637
40.98 Project deleted
Dec 9, 2011




Access Genorma App Everywhere

Get fast and easy access to top European and International standards (EN, ISO, IEC) via your mobile phone, tablet or the web.