This document describes the routine factory production control, the periodic testing and inspection and test methods to verify that an insulating glass unit (IGU) conforms to the system description.
PUBLISHED
EN 1279-6:2018
IN_DEVELOPMENT
prEN 1279-6 rev
00.60
Close of review
Mar 13, 2025