ISO 6182-8:2006

Fire protection — Automatic sprinkler systems — Part 8: Requirements and test methods for pre-action dry alarm valves

Publication date:   Mar 8, 2006

95.99 Withdrawal of Standard   May 29, 2019

General information

95.99 Withdrawal of Standard   May 29, 2019

ISO

ISO/TC 21/SC 5 Fixed firefighting systems using water

International Standard

13.220.20   Fire protection

Buying

  Withdrawn

PDF - €76.23

  English  



Buy

Scope

ISO 6182-8:2006 specifies performance requirements, methods of test and marking requirements for pre-action dry alarm valves and manufacturers' specified relevant trim used in non-interlock pre-action automatic fire protection systems.
Performance and test requirements for other auxiliary components or attachments to pre-action dry valves are not covered by ISO 6182-8:2006.

Life cycle

NOW

WITHDRAWN
ISO 6182-8:2006
95.99 Withdrawal of Standard
May 29, 2019

REVISED BY

PUBLISHED
ISO 6182-8:2019