ISO 2314:2009

Gas turbines — Acceptance tests ISO 2314:2009

General information

90.92 Standard to be revised   Jun 12, 2023

ISO

ISO/TC 192 Gas turbines

International Standard

27.040   Gas and steam turbines. Steam engines

Scope

This International Standard applies to open-cycle gas-turbine power plants using combustion systems supplied with gaseous and/or liquid fuels as well as closed-cycle and semi-closed-cycle gas-turbine power plants. It can also be applied to gas turbines in combined cycle power plants or in connection with other heat-recovery systems.
In cases of gas turbines using free-piston gas generators or special heat sources (for example synthetic gas of chemical processes, blast furnace gas), this International Standard can be used as a basis but suitable modifications are necessary.
Acceptance tests of gas turbines with emission control and/or power augmentation devices that are based on fluid injection and/or inlet air treatment are also covered by this International Standard and it is necessary that they be considered in the test procedure, provided that such systems are included in the contractual scope of the supply subject to testing.
This International Standard does not apply to emission testing, noise testing, vibration testing, performance of specific components of the gas turbine, performance of power augmentation devices and auxiliary systems, such as air inlet cooling devices, fuel gas compressors, etc., conduct test work aiming at development and research, adequacy of essential protective devices, performance of the governing system and protective systems, and operating characteristics (starting characteristics, reliability testing, etc.).

Life cycle

PREVIOUSLY

WITHDRAWN
ISO 2314:1989

WITHDRAWN
ISO 2314:1989/Amd 1:1997

WITHDRAWN
ISO 2314:1989/Cor 1:1997

NOW

PUBLISHED
ISO 2314:2009
90.92 Standard to be revised
Jun 12, 2023

REVISED BY

ABANDON
ISO/NP 2314

IN_DEVELOPMENT
ISO/AWI 2314