ISO 21725-2:2021

Simplified design of prestressed concrete bridges — Part 2: Box-girder bridges ISO 21725-2:2021

Publication date:   Nov 1, 2021

General information

60.60 Standard published   Nov 1, 2021

ISO

ISO/TC 71/SC 5 Simplified design standard for concrete structures

International Standard

93.040   Bridge construction | 91.080.40   Concrete structures

Buying

Published

Language in which you want to receive the document.

Scope

This document provides information to perform the design of the prestressed concrete box girder bridge for road that complies with the limitations established in 6.1. The rules of design as set forth in the document are simplifications of more elaborate requirements. Among several erection methods of box girder bridges, the provisions of this document are mainly applicable to full staging method (FSM).
Designs and details for new road bridges address structural integrity by considering the following:
—    the use of continuity and redundancy to provide one or more alternate paths;
—    structural members and bearing seat widths that are resistant to damage or instability; and
—    external protection systems to minimize the effects of reasonably conceived severe loads.

Life cycle

NOW

PUBLISHED
ISO 21725-2:2021
60.60 Standard published
Nov 1, 2021