ISO 20519:2017

Ships and marine technology — Specification for bunkering of liquefied natural gas fuelled vessels ISO 20519:2017

Publication date:   Feb 10, 2017

95.99 Withdrawal of Standard   Dec 3, 2021

General information

95.99 Withdrawal of Standard   Dec 3, 2021

ISO

ISO/TC 8 Ships and marine technology

International Standard

47.020.99   Other standards related to shipbuilding and marine structures

Buying

Withdrawn

Language in which you want to receive the document.

Scope

ISO 20519:2017 sets requirements for LNG bunkering transfer systems and equipment used to bunker LNG fuelled vessels, which are not covered by the IGC Code. This document includes the following five elements:
a) hardware: liquid and vapour transfer systems;
b) operational procedures;
c) requirement for the LNG provider to provide an LNG bunker delivery note;
d) training and qualifications of personnel involved;
e) requirements for LNG facilities to meet applicable ISO standards and local codes.

Life cycle

NOW

WITHDRAWN
ISO 20519:2017
95.99 Withdrawal of Standard
Dec 3, 2021

REVISED BY

PUBLISHED
ISO 20519:2021