IEC TS 61724-3:2016(E) defines a procedure for measuring and analyzing the energy production of a specific photovoltaic system relative to expected electrical energy production for the same system from actual weather conditions as defined by the stakeholders of the test. The energy production is characterized specifically for times when the system is operating (available); times when the system is not operating (unavailable) are quantified as part of an availability metric. The aim of this technical specification is to define a procedure for comparing the measured electrical energy with the expected electrical energy of the PV system.
The contents of the corrigendum of February 2018 have been included in this copy.
WITHDRAWN
IEC 61724:1998 ED1
PUBLISHED
IEC TS 61724-3:2016 ED1
60.60
Standard published
Jul 19, 2016
PUBLISHED
IEC TS 61724-3:2016/COR1:2018 ED1
ABANDON
IEC TS 61724-3 ED2