IEC TR 63191:2018 ED1

Demand side power quality management

Publication date:   Nov 23, 2018

General information

99.60 Withdrawal effective   Nov 29, 2023

IEC

TC 85

Technical Report

33.200   Telecontrol. Telemetering

Buying

  Replaced

PDF - €417.45

  English  



Buy

Scope

IEC TR 63191:2018(E) specifies recommendations about power quality measurement and assessment within installations.
IEC TR 63191:2018 outlines the various phases needed for the establishment of a demand side power quality measurement plan for buildings and industry installations.
Such a power quality measurement plan will enable the optimization of the energy availability and efficiency, improve the assets lifetime and facilitate the resolutions of power quality problems. A power quality measurement plan encompasses the following stages:
• definition of the context, objectives and constraints;
• assessment of the initial power quality situation;
• definition of an action plan for the improvement of the power quality situation;
• implementation of the power quality measuring system;
• exploitation of the measurement system for the improvement of the power quality situation;
• maintenance of the measurement system.
IEC TR 63191:2018 will also help facility managers to tailor their measurement plan to the specific needs of the electrical system under their control. It addresses all the disturbances present in such networks, but does not cover the disturbances present in public electrical distribution networks (supply side) as they are governed by specific documents such as EN 50160 and IEC TS 62749.

Life cycle

NOW

WITHDRAWN
IEC TR 63191:2018 ED1
99.60 Withdrawal effective
Nov 29, 2023

REVISED BY

ABANDON
IEC TS 63191 ED2

PUBLISHED
IEC TS 63191:2023 ED1

PUBLISHED
IEC TS 63191:2023 ED1