IEC 62382:2012 ED2

Control systems in the process industry - Electrical and instrumentation loop check IEC 62382:2012 ED2

Publication date:   Nov 8, 2012

General information

60.60 Standard published   Nov 8, 2012

IEC

TC 65/SC 65E

International Standard

25.040.40   Industrial process measurement and control

Buying

Published

Language in which you want to receive the document.

Scope

IEC 62382:2012 describes the steps recommended to complete a loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. This standard is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). This second edition cancels and replaces the first edition published in 2006 and constitutes a technical revision. The main changes with respect to the previous edition are: The definition of the documents mentioned in the standards is in accordance with IEC 62708: Documents for Electrical and Instrumentation Projects in the Process Industry. Subclause 6.3 has been revised.

Life cycle

PREVIOUSLY

WITHDRAWN
IEC 62382:2006 ED1

NOW

PUBLISHED
IEC 62382:2012 ED2
60.60 Standard published
Nov 8, 2012

REVISED BY

IN_DEVELOPMENT
IEC 62382 ED3