IEC 61869-5:2011 ED1

Instrument transformers - Part 5: Additional requirements for capacitor voltage transformers IEC 61869-5:2011 ED1

Publication date:   Jul 13, 2011

General information

60.60 Standard published   Jul 13, 2011

IEC

TC 38

International Standard

17.220.20   Measurement of electrical and magnetic quantities

Buying

Published

Language in which you want to receive the document.

Scope

IEC 61869-5:2011 applies to new single-phase capacitor voltage transformers connected between line and ground for system voltages Um ≥ 72,5 kV at power frequencies from 15 Hz to 100 Hz. They are intended to supply a low voltage for measurement, control and protective functions. This standard replaces IEC 60044-5 regarding capacitor voltage transformers as well as IEC-PAS 60044-5 for capacitor voltage transformers.

This publication is to be read in conjunction with IEC 61869-1:2007. The contents of the corrigendum of August 2015 have been included in this copy.

Life cycle

PREVIOUSLY

WITHDRAWN
IEC 60044-5:2004 ED1

NOW

PUBLISHED
IEC 61869-5:2011 ED1
60.60 Standard published
Jul 13, 2011

CORRIGENDA / AMENDMENTS

PUBLISHED
IEC 61869-5:2011/COR1:2015 ED1

REVISED BY

IN_DEVELOPMENT
IEC 61869-5 ED2