IEC 61850-7-410:2012 ED2

Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control

Publication date:   Oct 30, 2012

General information

99.60   Withdrawal effective   Jul 16, 2026

IEC

TC 57

International Standard

33.200   Telecontrol. Telemetering

Buying

  Revised

PDF - €459.80

  English   French  



Buy

Scope

IEC 61850-7-410:2012 specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant. The main changes with respect to the previous edition are as follows:
- the logical nodes in IEC 61850-7-410:2007 that were not specific to hydropower plants have been transferred to IEC 61850-7-4:2010;
- the definitions of logical nodes in this edition of IEC 61850-7-410 have been updated;
- most of the modelling examples and background information included in IEC 61850-7-410:2007 have been transferred to IEC/TR 61850-7-510.
This new edition of IEC 61850-7-410 includes additional general-purpose logical nodes that were not included in IEC 61850-7-4:2010, but are required in order to represent the complete control and monitoring system of a hydropower plant.

Life cycle

PREVIOUSLY

WITHDRAWN
IEC 61850-7-410:2007 ED1

NOW

WITHDRAWN
IEC 61850-7-410:2012 ED2
99.60 Withdrawal effective
Jul 16, 2026

CORRIGENDA / AMENDMENTS

WITHDRAWN
IEC 61850-7-410:2012/AMD1:2015 ED2

REVISED BY

PUBLISHED
IEC 61850-7-410:2026 ED3