IEC 61784-5-6:2010 ED2

Industrial communication networks - Profiles - Part 5-6: Installation of fieldbuses - Installation profiles for CPF 6 IEC 61784-5-6:2010 ED2

Publication date:   Jul 22, 2010

General information

99.60 Withdrawal effective   Sep 17, 2013

IEC

TC 65/SC 65C

International Standard

25.040.40   Industrial process measurement and control | 35.100.40   Transport layer

Buying

Revised

Language in which you want to receive the document.

Scope

IEC 61784-5-6:2010 specifies the installation profiles for CPF 6 (INTERBUS). The installation profiles are specified in the annexes. These annexes are read in conjunction with IEC 61918:2010. This second edition cancels and replaces the first edition published in 2007. It constitutes a technical revision and includes the following technical changes with respect to the previous edition:
- alignment to IEC 61918:2010;
- addition of the M12-FO connector. This bilingual version (2012-02) corresponds to the monolingual English version, published in 2010-07.

This publication is to be read in conjunction with IEC 61918:2010.

Life cycle

PREVIOUSLY

WITHDRAWN
IEC 61784-5-6:2007 ED1

NOW

WITHDRAWN
IEC 61784-5-6:2010 ED2
99.60 Withdrawal effective
Sep 17, 2013

REVISED BY

WITHDRAWN
IEC 61784-5-6:2013 ED3